SOLAR 100 CONCEPTUAL STUDY, FINAL REPORT

by McDonnell Douglas Corporation Southern California Edison Company, Bechtel Power Corporation (Prepared by:)

Technical Report, August 1982

Barcode

CSP Unique ID 190681964

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

1022 File 1; Report; August 1982.

Language

Library's review

ABSTRACT:
This study was conducted to determine the present day feasibility of designing and constructing a commercial size (100 MWe} solar thermal power plant, to be located in the southwestern United States. A conceptual design was developed and its financial aspects were explored; the study
Show More
included consideration of:
*Alternate systems
* Capitol operating and maintenance costs
* Financing and tax implications
* Ownership by private utilities, municipal or other public agencies, or private investors ยท
This report describes the procedures, conceptual design, financial analysis and the conclusions and recommendations. Figure I.A. I is an artist's rendering of the central receiver solar plant which uses 2 heliostat fields to produce a nominal 100 MWe net at a 60% capacity factor.
Prepared by: Southern California Edison Company (contact Ken Ross at (213) 572-2192) McDonnell Douglas Corporation (contact Dr. Jay Roland (714) 896-4322) Bechtel Power Corporation (contact John Bouma (213) 864-6011)
Show Less