SOLAR TOTAL ENERGY PROJECT, SHENANDOAH, OPERATING PLAN

by GENERAL ELECTRIC COMPANY (SPACE DIVISION),

Technical Report, 1979

Barcode

CSP Unique ID 190682203

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

1359; Report; December 1979.

Language

Library's review

ABSTRACT:
The Solar Total Energy System (STES) being developed for the Solar Total Energy Project (STEP) at Shenandoah Georgia will provide process heat, electric power, and space heating - and cooling for the Bleyle Knitwear Plant. The plant will derive greater than 50 percent of its annual total
Show More
energy requirements from the sun when the STES becomes operational. This document is the Operating Plan for the STES. Primarily, it will serve as an orientation handbook and reference guide for personnel (operating engineers, operators, technicians, system evaluation engineers, etc.) who will participate in the operation of the STES. In addition, it provides guidelines and definition for development of the plant operating and control system.
Show Less
Page: 0.7126 seconds