ABSTRACT:
This is the Final Environmental Impact Assessment/Environmental Impact Report on the 10 MW Solar Power Pilot Plant project. The project is the construction of a 10 Megawatt, Solar Thermal Electric, (STE} Pilot Plant in the Mojave Desert of California. It's purpose is to research, over a 5
Show More
year period, the technologic, economic and environmental feasibility of future STE utility application. The Pilot Plant will consist of a field of 2300 collector mirrors (heliostats) that will focus solar radiation on a boiler at the top of a 325' tower for the purpose of producing steam to drive a conventional turbine generator. The plant will require approximately 100 acres of a 130 acre site owned by Southern California Edison (SCE}. It will be located 1 mile east of SCE's existing Coolwater Generating Station, 10 miles east of Barstow (120 air miles northeast of Los Angeles).
Show Less
Page: 0.2288 seconds