PRELIMINARY DESIGN OF 5-MWE SOLAR-FOSSIL HYBRID ELECTRIC POWER PLANT AT CROSBYTON, TEXAS

by TEXAS TECH UNIVERSITY,

Technical Report, 1982

Barcode

CSP Unique ID 190682753

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

DOE ET 20255 T1_; Report; February 1982.

Language

Library's review

ABSTRACT:
This report presents the preliminary design and the construction cost for a 5 MW Solar Hybrid Electric Energy Plant (SHEEP) to be built at Crosbyton, Texas. The plant has been designed to serve as a small size, commercially operable power plant which fully demonstrates the function,
Show More
performance, and cost of this solar technology and integrated steam management concept. Good lifetime performance at minimum cost were the critical design objectives.
Show Less
Page: 0.0566 seconds