Link to document:
Status
Electronic Resource
Call number
Publication
DOE ET 20255 T2 Volume 2_; Report; February 1977.
Language
Library's review
ABSTRACT:
Interim report on the Crosbyton facility during phase I. Includes monthly statistics of the load by hour, boring logs for soil analysis, optical analysis, development of receiver thermal-fluid model, and overall anaylsis of materials and collector.
Interim report on the Crosbyton facility during phase I. Includes monthly statistics of the load by hour, boring logs for soil analysis, optical analysis, development of receiver thermal-fluid model, and overall anaylsis of materials and collector.