Link to document:
Status
Electronic Resource
Call number
Publication
DOE ET 21038 1 Volume I; Report; September 1979.
Language
Library's review
ABSTRACT:
This report is submitted by Martin Marietta Corporation to the Department of Energy in accordance with provisions of contract DE-ACO3-78ET21038. This final technical report summarizes the work related to the conceptual design, cost and performance of the Solar Central Receiver Hybrid Power
This report is submitted by Martin Marietta Corporation to the Department of Energy in accordance with provisions of contract DE-ACO3-78ET21038. This final technical report summarizes the work related to the conceptual design, cost and performance of the Solar Central Receiver Hybrid Power
Show More
System, Phase I, which was performed during the period of October 1978 through August 1979. Show Less