Link to document:
Status
Electronic Resource
Call number
Publication
DOE SF 10499 T 19 REV Aug 80; Report; August 1980.
Language
Library's review
ABSTRACT:
SCOPE- This document contains the procurement documentation prepared by the SFDI (Stearns-Roger) for the long lead material required to be procurred in support of the Collector Field Electrical Construction Package llA for the 10 fJWe Solar Pilot Plant being constructed at Daggett,
SCOPE- This document contains the procurement documentation prepared by the SFDI (Stearns-Roger) for the long lead material required to be procurred in support of the Collector Field Electrical Construction Package llA for the 10 fJWe Solar Pilot Plant being constructed at Daggett,
Show More
California. Show Less