10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, THERMAL OIL PIPING CONSTRUCTION PK 9 (RADL ITEM 7-8)

by STEARNS-ROGER ENGINEERING CORPORATION,

Technical Report, 1980

Barcode

CSP Unique ID 190682952

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

DOE SF 10499 T110 STMPO 195 SAN 0499 50 MDC G8502 Book 20; Report; September 1980.

Language

Library's review

ABSTRACT:
The Plant Support Subsystem Final Design Calculations (RADL Item 7-8) are arranged in a twenty-six book volume as shown on the master Table of Contents. Book 20 of this document is provided in support of the Mechanical Equipment Installation, Construction Package No. 9 and includes cases
Show More
of seismic analyses for the thermal oil piping design.