Link to document:
Status
Electronic Resource
Call number
Publication
DOE SF 10499 T120; Report; July 1981.
Language
Library's review
ABSTRACT:
NITROGEN, PREOPERATIONAL TEST, PROCEDURE 905 by U.S. DEPARTMENT OF ENERGY/SOUTHERN CALIFORNIA EDISON COMPANY.
OBJECTIVES (906) - GN2 Supply System 1.1 Demonstrate that the GNz system is capable of supplying nitrogen at the specified pressure. (266) -TSS GN2 System 1.2 Demonstrate that the
NITROGEN, PREOPERATIONAL TEST, PROCEDURE 905 by U.S. DEPARTMENT OF ENERGY/SOUTHERN CALIFORNIA EDISON COMPANY.
OBJECTIVES (906) - GN2 Supply System 1.1 Demonstrate that the GNz system is capable of supplying nitrogen at the specified pressure. (266) -TSS GN2 System 1.2 Demonstrate that the
Show More
nitrogen pressure supplied to the TSU pressure control valve PCV-4006 and the US pressure control valve PCV-4022 are as designed. 1.3 Demonstrate all DAS functions related to the TSS GN2 system. (776) -Turbine Generator 1.4 Demonstrate nitrogen pressure supplied to the feedwater heaters and condenser are as designed. Show Less