RECEIVER SYSTEM, PREOPERATIONAL TEST, PROCEDURE 000, 10 MWE SOLAR PILOT PLANT, DAGGETT, CALIFORNIA

by U.S. DEPARTMENT OF ENERGY/SOUTHERN CALIFORNIA EDISON COMPANY,

Technical Report

Barcode

CSP Unique ID 190682989

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

DOE SF 10499 T57; Report;

Language

Library's review

ABSTRACT:
This procedure addresses checkout and operation of Receiver Instrumentation, Controls, Red Line Unit (RLU) Logic, Interlock Logic System (ILS) Logic, and Valve Operations. The Appendix of this procedure has End to End Checkout of system transducers and components. The appendices are
Show More
prerequisite tests to be accomplished prior to preoperational checks. Merely confirming that the prerequisite test has been accomplished satisfies many preoperational test requirements.

Logic and function checks of the RLU and ILS circuits may be preformed in loops bypassing some componet not installed or functional at that time. These components preliminary checks which are accomplished with partially completed loops are for the benefit of speeding up the checkouts. Prior to acceptance of any logic or loop of the RLU or ILS the logic steps must be proved with the varible input at the transducer or by simulation into the junction box close to the transducer. The actual valve of pressure, temperature, or resistance will be simulated so the signal conditioner and other distribution components will be on line.
Show Less