DOE SF 10499 T89 STMPO 174 SAN 0499 48 MDC G8263; Report; May 1980.
Language
Library's review
ABSTRACT:
INTRODUCTION- The System Specification (RADL Item 2-3), PRELIMINARY, dated November 1979 (MDC G8220), herein referred to as the System Specification, specifies the availability goal for the 10 MWe Solar Thermal Central Receiver Pilot Plant, herein referred to as the "pilot plant", and
INTRODUCTION- The System Specification (RADL Item 2-3), PRELIMINARY, dated November 1979 (MDC G8220), herein referred to as the System Specification, specifies the availability goal for the 10 MWe Solar Thermal Central Receiver Pilot Plant, herein referred to as the "pilot plant", and
Show More
assigns availability goals to the subsystems of the pilot plant. This Pilot Plant Availability report presents the current predictions of the availability of the pilot plant and its subsystems. Show Less