10-MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, OVERALL PLANT DESIGN DESCRIPTION

by U.S. DEPARTMENT OF ENERGY,

Technical Report, 1978

Barcode

CSP Unique ID 190683036

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

DOE SF 10501 009; Report; March 1978.

Language

Library's review

ABSTRACT:
Summary - Application This Overall Plant Design Description {OPDD) constitutes the principal means to establish, describe, and control the design of the 10 MWe Solar Thermal Central Receiver Pilot Plant. Section 1.0 of the OPDD contains the specific functions and design requirements to be
Show More
satisfied by the design in accordance with overall project technical requirements.
The central receiver configuration has been selected by the U.S. Department of Energy (DOE) for early large-scale research, development, and demonstration. This pilot plant project will be the first integration of hardware and software in a functional power generating facility whose performance and reliability can be assessed in the context of utility operation.
Show Less
Page: 0.5283 seconds