ABSTRACT:
This document has been prepared to provide visibility into the various elements of the testing which comprises the pre-operational testing activity and interfaces required as part of the startup and acceptance testing. Martin Marietta shall provide technical inputs, personnel, software
This document has been prepared to provide visibility into the various elements of the testing which comprises the pre-operational testing activity and interfaces required as part of the startup and acceptance testing. Martin Marietta shall provide technical inputs, personnel, software
Show More
corrections and hardware replacement parts as necessary to participate in the plant integrated acceptance testing. Collector Subsystem Integrated Acceptance Testing will begin about 3 months prior to turbine roll and continue until full power operation is achieved and final acceptance of the Collector Subsystem is granted by STMPO. Show Less