Link to document:
Status
Electronic Resource
Call number
Publication
DOE SF 11437 2; Report; June 1981.
Language
Library's review
ABSTRACT:
This is volume II of the final report on Texagulf Solar Cogeneration Program. This report defines the system requirements, subsystem characteristics and required operating modes for a solar cogeneration facility to be located at the Texasgulf Comanche Creek sulfur mine in Fort Stockton,
This is volume II of the final report on Texagulf Solar Cogeneration Program. This report defines the system requirements, subsystem characteristics and required operating modes for a solar cogeneration facility to be located at the Texasgulf Comanche Creek sulfur mine in Fort Stockton,
Show More
Pecos County, Texas. The requirements provided in this specjfication are consistent with the level of detail and accuracy of a conceptual design study. The solar cogeneration facility for the Texasgulf Comanche Creek sulfur mine will be accomplished with minimal modification of the existing Frasch process mining operation. The system consists of a saturated water/steam solar central receiver coupled to a condensing, uncontrolled extraction superheat steam turbine (thru a superheat ·boiler) that delivers electricity and thermal power in the form of heated water. Show Less