TEXASGULF SOLAR COGENERATION PROGRAM, FINAL REPORT

by GENERAL ELECTRIC COMPANY,

Technical Report, 1981

Barcode

CSP Unique ID 190683172

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

DOE SF 11437 2; Report; June 1981.

Language

Library's review

ABSTRACT:
This is volume II of the final report on Texagulf Solar Cogeneration Program. This report defines the system requirements, subsystem characteristics and required operating modes for a solar cogeneration facility to be located at the Texasgulf Comanche Creek sulfur mine in Fort Stockton,
Show More
Pecos County, Texas. The requirements provided in this specjfication are consistent with the level of detail and accuracy of a conceptual design study. The solar cogeneration facility for the Texasgulf Comanche Creek sulfur mine will be accomplished with minimal modification of the existing Frasch process mining operation. The system consists of a saturated water/steam solar central receiver coupled to a condensing, uncontrolled extraction superheat steam turbine (thru a superheat ·boiler) that delivers electricity and thermal power in the form of heated water.
Show Less
Page: 0.0648 seconds