FORT HOOD SOLAR COGENERATION FACILITY CONCEPTUAL DESIGN STUDY, FINAL REPORT, SYSTEM SPECIFICATION

by MCDONNELL DOUGLAS ASTRONAUTICS COMPANY,

Technical Report, 1981

Barcode

CSP Unique ID 190683181

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

DOE SF 11495 T1 Volume 2; Report; August 1981.

Language

Library's review

ABSTRACT:
The McDonnell Douglas Astronautics Company (MDAC), with the support of the Stearns-Roger Company and the University of Houston Energy Laboratory, was awarded a nine-month study by the Department of Energy, San Francisco Office (DOE/SAN) under Contract No. DE-AC03-81SF 11495, to conduct a
Show More
conceptual design study .of a solar cogeneration facility at the U. S. Army Fort Hood Base in Killeen, Texas. This project is part of the DOD's program plan to demonstrate the technical, economic, and institutional feasibility of a central receiver solar cogeneration facility in which solar energy is collected and used to provide both high grade energy for the generation of electricity and low grade energy for space heating and cooling, water heating and other useful purposes.

This document constitutes the System Specification for a Solar Cogeneration Facility at the Fort Hood Army Base. This specification has been prepared in general accordance with the reporting instructions as specified in Enclosure III, Exhibit I, Attachment I of DE-RP03-80SF10768.

This document is submitted as Volume II of the Final Technical Report, which includes two volumes, as follows:
Volume I - Technical Report
Volume II - System Specification
Show Less
Page: 0.1155 seconds