Availability Analysis of an Integrated Gasification-Combined Cycle

by Arinc Research Corporation,

Technical Report, 1987

Barcode

CSP Unique ID 190683248

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

EPRI AP 5276; Report; June 1987.

Language

Library's review

ABSTRACT:
The Electric Power Research Institute (EPRI) contracted with ARINC Research Corporation to perform availability assessments of an integrated coal gasification-combined-cycle (IGCC) design. The objective of the study was to quantify the availability impact associated with several design and
Show More
operating options specified by EPRI. In addition, several scheduled maintenance options for the IGCC plant were evaluated.
Show Less
Page: 0.0674 seconds