Integrated Test Procedures for Receiver Testing

by Martin Marietta Corporation,

Technical Report, 1983

Barcode

CSP Unique ID 190683447

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

MCR 83 547; Report; July 1983.

Language

Library's review

ABSTRACT:
These Integrated Test Procedures cover the Receiver Testing of the Molten Salt Electric Experiment (MSEE) at the Central Receiver Test Facility (CRTF) in Albuquerque, New Mexico. The purpose of this test is to demonstrate the design and performance of the Receiver and Thermal Storage
Show More
Subsystems. The Receiver Subsystem consists of the receiver panel, cavity enclosure with one vertical aperture door, cold surge tank, booster pump, hot surge tank, overflow tank and control valves. The thermal storage tanks, a propane-fired salt heater, and cold salt pump are part of the Thermal Storage Subsystem which supplies molten salt to the Receiver Subsystem. The working fluid used by the Receiver and Thermal Storage Subsystems is a salt mixture of 60% NaN03 and 40% KN03. This fluid is heated using the reflected solar insolation that is concentrated on the receiver panel from the Collector Subsystem.
Show Less
Page: 0.0868 seconds