TECHNICAL OBJECTIVES REPORT-MCS (RADL ITEM 2-26)

by MCDONNELL DOUGLAS ASTRONAUTICS COMPANY,

Technical Report, 1979

Barcode

CSP Unique ID 190683484

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

MDC G7895 SAN 0499 14; Report; December 1979.

Language

Library's review

ABSTRACT:
This document establishes the technical objectives and general requirements for the Master Control Subsystem (MCS) of the Solar 10 MWe Pilot Plant. The technical objectives define the operating capabilities of the plant which concern the MCS. MCS is a set of hardware and software to be
Show More
used to monitor and control the plant operations from a central control room. The operations described here include plant control in various power-generating and/or energy-storing modes (operating modes), and normal and emergency mode transitions.
Show Less
Page: 0.1835 seconds