Link to document:
Status
Electronic Resource
Call number
Publication
SAN 0499 3 MDC G7836; Report; July 1979.
Language
Library's review
ABSTRACT:
This plan presents the Quality Assurance Program for the 10 MWe Solar Thermal Central Receiver Pilot Plant. It is designed to assure that material, hardware and software conform to acceptance requirements; that interfaces, subsystems and system have a high probability of performing their
• Identify system purpose or function in measurable performance terms.
• Select subsystem implementing requirements and the verification position at which evaluation will be made. Include codes, regulations, and standards.
• Design acceptance verifications to truly measure performance emphasizing subsystem-to-system relations hips. Include safety, FMEA, availability and maintenance.
• Repeat the above as requirements change.
This plan presents the Quality Assurance Program for the 10 MWe Solar Thermal Central Receiver Pilot Plant. It is designed to assure that material, hardware and software conform to acceptance requirements; that interfaces, subsystems and system have a high probability of performing their
Show More
intended functions; and that the plant availability goal of 90% can be realized. The plan stresses effective functional performance through the following tasks. • Identify system purpose or function in measurable performance terms.
• Select subsystem implementing requirements and the verification position at which evaluation will be made. Include codes, regulations, and standards.
• Design acceptance verifications to truly measure performance emphasizing subsystem-to-system relations hips. Include safety, FMEA, availability and maintenance.
• Repeat the above as requirements change.
Show Less