Link to document:
Status
Electronic Resource
Call number
Publication
SAN 0499 8 MDC G7863 July 79; Report; July 1979.
Language
Library's review
ABSTRACT:
This technical construction package will become Section 4 of the invitation for bid being prepared by the Department of Energy for the Site Development and Preliminary Earthwork Construction Package No. 1, soon to be released for bid. RADL 7-27 includes two parts, as follows:
• Technical
• Supplemental construction drawings as identified in Paragraph 2.1 of the Technical Specification
This technical construction package will become Section 4 of the invitation for bid being prepared by the Department of Energy for the Site Development and Preliminary Earthwork Construction Package No. 1, soon to be released for bid. RADL 7-27 includes two parts, as follows:
• Technical
Show More
Specifications for Construction Package No. l, identified as STMPO Drawing No. 40C7001S (Stearns-Roger Project No. C-21700) • Supplemental construction drawings as identified in Paragraph 2.1 of the Technical Specification
Show Less