Link to document:
Status
Electronic Resource
Call number
Publication
SAN 1068 1 Final Report; Report; February 1978.
Language
Library's review
ABSTRACT:
FOREWORD: This report is submitted by Martin Marietta Corporation, Denver Division, in accordance with the Department of Energy Contract EY-76-C-03-1068 as a final report, Contractual Data Requirements List, Item No. 4. This report will describe all the equipment as it presently exists
FOREWORD: This report is submitted by Martin Marietta Corporation, Denver Division, in accordance with the Department of Energy Contract EY-76-C-03-1068 as a final report, Contractual Data Requirements List, Item No. 4. This report will describe all the equipment as it presently exists
Show More
and its capability. Thus this document can be used for possible future application of the equipment. Previous tests will not be summarized in this report but results can be found as follows: Radiant IR Test Phase 2 Test Summary Report, 1 MWth Bench Model Solar Cavity Receiver Steam Generator Build and Test, June 1976 MCR-76-133 (Issue 2). Solar Test CNRS France -Phase 3 Test Summary Report, 1 MWth Bench Model Solar Cavity Receiver Steam Generator Build and Test, June 1977 MCR-76-133 (Issue 3). Show Less