SOLAR PILOT PLANT PHASE 1, PRELIMINARY DESIGN REPORT, ELECTRICAL POWER GENERATION, MASTER CONTROL SUBSYSTEMS, BALANCE OF PLANT (CDRL 2)

by HONEYWELL INC.,

Technical Report, 1977

Barcode

CSP Unique ID 190683888

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

SAN 1109 8 8 Phase 1 Vol 6 Item 2; Report; May 1977.

Language

Library's review

ABSTRACT:
"This document is volume 6 of 7 of the Preliminary Design Report on the Phase 1 Solar Pilot Plant by Honeywell. Volume 6 describes the Electrical Power Generation, Master Control Subsystems, and Balance of Plant. The Honeywell electrical power generation subsystem centers on a General
Show More
Electric dual admission, triple extraction turbine generator sized to the output requirements of the Pilot Plant. The turbine receives steam from the receiver subsystem and/or the thermal storage subsystem and supplies those subsystems with feedwater. The turbine condenser is wet cooled. The plant control system consists of a coordinated digital master and subsystem digital/analog controls. The remainder of the plant, work spaces, maintenance areas. roads, and reception area are laid out to provide maximum convenience compatible with utility and safety. Most of the activities are housed in a complex around the base of the receiver tower. This volume contains a description of the relationship of the electrical power generation subsystem
to the rest of the plant. the design methodology and evolution, the interface integration and control, and the operation and maintenance procedures."
Show Less
Page: 0.0691 seconds