Link to document:
Status
Electronic Resource
Call number
Publication
SAND Report: SAND80-1568, August 1980.
Collection
Language
Library's review
ABSTRACT:
The 150 kWe Solar Irrigation Project at Coolidge, Arizona consists of a 23,OOO-ft2 line focus collector subsystem, a 30, OOO-gallon thermal storage subsystem, and a 150 kWe power generation unit. The purpose of this document is to present the plan for the facility's testing and evaluation,
The 150 kWe Solar Irrigation Project at Coolidge, Arizona consists of a 23,OOO-ft2 line focus collector subsystem, a 30, OOO-gallon thermal storage subsystem, and a 150 kWe power generation unit. The purpose of this document is to present the plan for the facility's testing and evaluation,
Show More
a description of the facility, and the objectives of the project. Detailed test plans and a schedule are included. Show Less