Alternate central receiver power system : phase II. Volume I, executive summary

by Livermore Sandia National Laboratories, CA

Technical Report, 1984

Barcode

CSP Unique ID 190707314

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

SAND Report: SAND81-8192/1, January 1984.

Language

Library's review

ABSTRACT:
The objective of the Phase II Alternate Central Receiver program was to demonstrate the feasibility of the molten salt central receiver power system by conducting a series of experiments and using the results to update the commercial-scale design developed during Phase I of the program.
Show More
The experiments were directed at two levels of inquiry: the systems-level testing of a 5 MWth molten salt receiver---hereafter referred to as the receiver SRE; and the investigation of molten salt chemistry and the compatibility of selected materials with molten salt. Detailed discussion of the receiver testing are contained in Volume II of this report, while the materials tests are the subject of Volume III.
Show Less
Page: 0.2347 seconds