10 MWe Solar Thermal Central Receiver Pilot Plant Repaint of a Single Receiver Panel Test Report

by Albuquerque Sandia National Laboratories, NM

Technical Report, 1987

Barcode

CSP Unique ID 190707792

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

SAND Report: SAND87-8175, February 1987

Language

Library's review

ABSTRACT:
This report describes the repainting of a receiver panel at the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, Ca. The plant, called Solar One, is a cooperative activity between the department of Energy and the Associates: Southern California Edison, the Los
Show More
Angeles Dept. of Water and Power and the California Energy Commission. This report describes the painting preparation, painting process, and evaluation conducted following the actual painting. The receiver panel was repainted to restore the absorptivity. The panel absorptivity increased from .875 to .96 following the painting.
Show Less
Page: 0.0698 seconds