Link to document:
Status
Electronic Resource
Call number
Publication
SAND Report: SAND86-8188, April 1987.
Collection
Language
Library's review
ABSTRACT:
This report describes results of tests on the automatic features added to the control system for the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, Ca. The plant, called Solar One, is a cooperative activity between the Department of Energy and the Associates:
This report describes results of tests on the automatic features added to the control system for the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, Ca. The plant, called Solar One, is a cooperative activity between the Department of Energy and the Associates:
Show More
Southern California Edison, the Los Angeles Dept. of Water and Power and the California Energy Commission. This report provides an overview of the automation features added to the plant control system, a description of tests performed on the system, and the results of those tests. Show Less