10 MWe Solar Thermal Central Receiver Pilot Plant remote operation feasibility study

by Livermore Sandia National Laboratories, CA

Technical Report, 1988

Barcode

CSP Unique ID 190707965

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

SAND Report: SAND86-8186, January 1988.

Language

Library's review

ABSTRACT:
This report describes the results of a feasibility study for remote operation of the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, California. The plant, called Solar One, is a cooperative activity between the Department of Energy and the Associates: Southern
Show More
California Edison, the Los Angeles Department of Water and Power, and the California Energy Commission. provides a description of the changes required to the plant and a rough cost estimate for the changes.
Show Less
Page: 0.0811 seconds