Molten Salt Steam Generator Subsystem Research Experiment. Phase 1, Final Report

by Livermore Sandia National Laboratories, CA

Other authorsFoster Wheeler
Technical Report, 1984

Barcode

CSP Unique ID 190709146

Status

Electronic Resource

Call number

**Click on MARC view for more information on this report.**

Publication

SAND Report: SAND84-8175, September 1984.

Language

Library's review

ABSTRACT:
This is the Executive Summary of a study conducted for Phase 1 of a two-phase project 'Iii/hose objectives were to develop a reliable, cost-effective molten salt steam generating subsystem for solar thermal plants, minimize uncertainty in capital, operating, and maintenance costs, and
Show More
demonstrate the ability of molten salt to generate high-pressure, high-temperature steam. The Phase 1 study involved the conceptual design of molten salt steam generating subsystems for a nominal 100-MWe net stand-alone solar central receiver electric generating plant, and a nominal 100-MWe net hybrid fossil-fueled electric power generating plant that is SU percent repowered by a solar central receiver system. As part of Phase 1, a proposal was prepared for Phase 2, which involves the design, construction, testing and evaluation of a Subsystem Research Experiment of sufficient size to ensure successful operation of the full-size subsystem designed in Phase 1. Evaluation of several concepts resulted in the selection of a four-component (preheater, evaporator, superheater, reheater), natural circulation, vertically oriented, shell and tube (straight) heat exchanger arrangement. Thermal hydraulic analysis of the system included full and part load performance, circulation requirements, stability, and critical heat flux analysis. Flow-induced tube vibration, tube buckling, fatigue evaluation of tubesheet junctions, steady-state tubesheet analysis, and a simplified transient analysis were included in the structural analysis of the system. Operating modes and system dynamic response to load changes were identified. Auxiliary equipment, fabrication, erection, and maintenance requirements were also defined. Installed capital costs and a project schedule were prepared for each design. The complete Phase 1 final report has been published as SAND82-8179.