Search | CSP Library | TinyCat
2024-05-05 8:48 pm
Toggle Dropdown
Advanced Search
CSP Library
Author search:
STEARNS-ROGER ENGINEERING/MCDONNELL DOUG,
50 items
title
Sort
relevancy
acquisition
title
date
author
popularity
series
50 items
50 items found
Sort
relevancy
acquisition
title
date
author
popularity
series
10 MWE SOLAR THEMAL CENTRAL RECEIVER PILOT PLANT, PLANT SUPPORT SUBSYSTEM PROCUREMENT DOCUMENTATION (RADL ITEM ITEM 7-44B)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, FINAL SUMMARY SOILS REPORT (RADL ITEM 7-1)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1979
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PLANT SUPPORT SUBSYSTEM PROCUREMENT DOCUMENTATION (RADL ITEM 7-44D)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PLANT SUPPORT SUBSYSTEM PROCUREMENT DOCUMENTATION (RADL ITEM 7-44A)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, COLLECTOR FIELD FOUNDATIONS CONSTRUCTION PKG 6 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, PSS CALORIA MAKEUP TANK CONSTRUCTION PKG 10 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, PSS FIELD ERECTED TANKS CONSTRUCTION PKG 10A (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, PSS FIELD ERECTED TANKS CONSTRUCTION PKG 10A (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, SITE DEVELOPMENT AND PRELIMINARY EARTHWORK CONSTRUCTION PKG 1 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, THERMAL OIL PIPING CONSTRUCTION PK 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 Mwe SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, THERMAL OIL PIPING CONSTRUCTION PK 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, THERMAL OIL PIPING CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, PSS FINAL DESIGN CALCULATIONS, THERMAL OIL PIPING CONSTRUCTION PKG 9 (RADL ITEM 7-9)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SITE DEVELOPMENT AND PRELIMINARY EARTHWORK (RADL ITEM 7-27)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1979
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, COLLECTOR FIELD FOUNDATIONS-CONSTRUCTION PKG 6 (RADL ITEM 7-31)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1979
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, FINAL EARTHWORK AND ROADWORK-CONSTRUCTION PKG 2 (RADL ITEM 7-28)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, PILOT PLANT AVAILABILITY
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, PLANT SUPPORT SUBSYSTEM FIELD ERECTED TANKS-CONSTRUCTION PKG 10A (RADL ITEM 7-42)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, PRELIMINARY DESIGN REVIEW-50% COMPLETE (RADL ITEM 1-5)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1979
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, PURCHASED DEMINERALIZED WATER TECHNICAL REQUIREMENTS SPECIFICATION (RADL ITEM 7-12A)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, STRUCTURAL STEEL AND BUILDINGS-CONSTRUCTION PKG 5 (RADL ITEM 7-30)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, WAREHOUSE-CONSTRUCTION PKG 3 (RADL ITEM 7-29)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10 MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR ONE PLANT CONTROL SEMINAR, FEBRUARY 25-26, 1981
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1981
10-MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, SYSTEM SAFETY PLAN (RADL ITEM 2-24)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1979
10MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, PSS FINAL DESIGN CALCULATIONS, VENT LINE PIPING CONSTRUCTION PK 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
10MWE SOLAR THERMAL CENTRAL RECEIVER PILOT PLANT, SOLAR FACILITIES DESIGN INTEGRATION, WORK PLAN (RADL ITEM 1-3)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1979
BCS TECHNICAL OBJECTIVES AND DESIGN REQUIREMENTS (RADL ITEM 3-1)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1979
BEAM CHARACTERIZATION SUBSYSTEM TARGETS PROCUREMENT DOCUMENTATION (RADL ITEM 7-43)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
DESIGN CALCULATIONS FOR COLLECTOR FIELD ELECTRICAL, CONSTRUCTION PKG 11A (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
NITROGEN SUPPLY SYSTEM TECHNICAL REQUIREMENTS SPECIFICATION (RADL ITEM 7-12B)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, CONDENSATE PIPING CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, MAIN STEAM PIPING CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, MAIN STEAM PIPING CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, MDAC GENERAL ANALYSIS AND BACKGROUND DATA (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, PIPING AND MECHANICAL EQUIPMENT CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, PIPING AND MECHANICAL EQUIPMENT CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, PIPING CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, PLANT ELECTRICAL CONSTRUCTION PKG 11 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, RECEIVER FEEDWATER PIPING CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, RECEIVER TOWER FOUNDATIONS CONSTRUCTION PKG 7A (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, STEAM PIPING CONSTRUCTION PKG 9 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
PSS FINAL DESIGN CALCULATIONS, STRUCTURAL STEEL AND BUILDINGS CONSTRUCTION PKG 5 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report
PSS FINAL DESIGN CALCULATIONS, THERMAL STORAGE AND PLANT SUPPORT SUBSYSTEM FOUNDATIONS CONSTRUCTION PKG 7 (RADL ITEM 7-8)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
RECEIVER FEEDWATER PUMP AND DRIVE SPECIFICATION (RADL ITEM 7-38)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
RECEIVER SUBSYSTEM AND THERMAL STORAGE SUBSYSTEM PROCUREMENT DOCUMENTATION (RADL ITEM 4-3)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
RECEIVER TOWER FOUNDATION-CONSTRUCTION PKG 7A (RADL ITEM 7-40)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1979
RECEIVER TOWER STRUCTURAL ANALYSIS-CONSTRUCTION PKG 5A (RADL ITEM 7-21)
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
SITE PLOT PLAN (RADL ITEM ITEM 7-2)
by
STEARNS-ROGER ENGINEERING/MCDONNELL DOUGLAS ASTRONAUTICS COMPANY
Schematic Diagrams, September 1979
SOLAR FACILITIES DESIGN INTEGRATION, CONSTRUCTION PKG 9 (RADL ITEM 7-33) PIPING AND MECHANICAL EQUIPMENT INSTALLATION
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1980
SOLAR ONE TRAINING MATERIAL
by
STEARNS-ROGER ENGINEERING CORPORATION,
Technical Report, 1981
Page: 1.5275 seconds